Haydn Office Gets a Reliable Daikin VRV Upgrade

Vicky Keatley • April 9, 2026
Air conditioning grilles in Haydn's offices in Christchurch.

Haydn’s Christchurch office now has a simpler, more reliable Daikin VRV system that was designed, supplied, and installed within four weeks after ongoing failures of the previous Fujitsu VRV left staff in an all-glass building unbearably hot.

Project Overview

The Heat Pump People’s air conditioning team was engaged by Haydn, a national paint brush and hardware supplier, to replace a failed Fujitsu VRV system serving their two-storey office in Christchurch. The original system had suffered ongoing gas leak issues for several months, and another contractor had already recommended full replacement when The Heat Pump People was invited to provide a second quote.

The Challenge

With a fully glazed office and no opening windows on the first floor, staff comfort plummeted as the failing system struggled to cool the space. The client needed a fast, dependable solution that would restore comfort for around a dozen office staff while also supporting the wider warehouse operation on site.

The Solution

The Heat Pump People proposed a like-for-like Daikin VRV replacement, selected for fast design support, competitive pricing, and as the team’s preferred equipment choice. The system was redesigned from a single VRV to two separate Daikin VRV systems, one per floor, each with its own outdoor unit, branch selector box, and seven indoor ducted units with individual wired controllers. All copper refrigerant pipework was replaced with new three-pipe runs from the outdoor units to the branch selector boxes, while existing drains and suitable electrical circuits were reused to control costs and minimise disruption.


To improve air distribution and performance, 28 new plenums were installed along with new ducting on the ground floor, and the return air strategy was upgraded from using the ceiling void as a return to fully ducted return air. A dedicated Daikin Cora high wall split was added for the server room, replacing the previous arrangement where it shared an office ducted unit and giving IT better, independent temperature control.

Delivery and Timing

From initial visit to commissioning, the full replacement was delivered within four weeks, including design, quotation, procurement, installation, and testing. Works were staged floor-by-floor to keep the business running: the ground floor was completed in week one, and the first floor in week two, with the client’s IT team relocating staff as needed. The system was commissioned on the final Friday without any faults or hiccups reported.

Results and Client Feedback

Haydn’s team reports that the new Daikin VRV system is “running better than ever,” with noticeably higher condensate production from the outdoor units indicating significantly improved cooling performance. By splitting the building into two independent systems, the client is now better protected against future whole-building failures, as any fault would affect only one floor rather than the entire office. The Heat Pump People has also taken over ongoing maintenance, ensuring the system continues to operate reliably.


Beyond the technical improvements, the office atmosphere has lifted, with staff enjoying a comfortable, cool workspace—and even commenting on how much they enjoy the “daily karaoke” from the installation team as they worked to the soundtrack of classic pop hits during the project.

Share this blog:

Daikin VRV7 outdoor heat pump unit on balcony
By Vicky Keatley March 25, 2026
Discover the new Daikin VRV 7 S Series, combining compact design, advanced technology, and efficient heating and cooling for commercial and luxury residential projects in Canterbury.
Family sitting on floor in front of Daikin Aura floor console unit.
By Vicky Keatley March 17, 2026
Discover how Daikin Multi Split systems with Aura indoor units deliver flexible heating, cooling, efficient performance and air purification for multiple rooms in Canterbury homes.
Mitsubishi Electric floor console heat pump in modern living room with large windows.
By Vicky Keatley March 6, 2026
Discover why Mitsubishi Electric RapidHeat floor console heat pumps suit Christchurch villas & renovations. Local expert installation.
Mother bathing child in bubble bath. Child tipping water on head.
By Vicky Keatley December 11, 2025
Discover the Daikin CO₂ Hot Water Heat Pump from The Heat Pump People in Canterbury, delivering efficient, low-carbon hot water and long-term savings for Kiwi homes.
Gree WHIO hot water heat pump over laying an image of a bathroom
By Vicky Keatley December 2, 2025
Upgrade to a Gree WHIO external hot water heat pump in Christchurch. Enjoy a COP of 5.4, 7‑year warranty, Wi‑Fi control and eco‑friendly R290 refrigerant. Talk to The Heat Pump People today.
Portable v Installed Heat Pumps (image of Carrier unit and Daikin high wall unit).
By Vicky Keatley October 10, 2025
Compare portable air conditioners & installed heat pumps. Discover benefits, drawbacks & expert advice for staying comfortable in our changing climate.
Daikin Aura floor standing heat pump next to small table and single chair.
By Vicky Keatley October 3, 2025
Discover the Daikin Aura floor heat pump at The Heat Pump People. Cleaner air, Wi-Fi control, and fast warmth for Christchurch homes. Call 03 366 1823.
By Vicky Keatley September 26, 2025
Spring is the best time to install a heat pump in Canterbury—skip summer delays, enjoy cleaner air, and be holiday-ready with The Heat Pump People.
Pink and white spring blossom in the sun with the words
By Vicky Keatley September 12, 2025
Give your heat pump a fresh start this spring. Professional servicing in Christchurch & Canterbury improves air quality, boosts efficiency, and gets you summer-ready.
Outdoor heat pump units with snow in defrost cycle
July 3, 2025
Heat pump making strange sounds? It could be the defrost cycle, causing gushing, humming, or whooshing noises. Learn more about this process.